Case Study One - Mogden Sewage Works

We provided a working platform inside one of the drained sewage tanks to allow access for refurbishment works. Problems to overcome involved erecting scaffolding on sloping floor and working in confined space coditions. We were able to overcome these problems by providing technical drawings/calculations to the main contractor for approval prior to commencment of works and undertaking confined space training.

 

Case Study Two - Castle Hall, The Wash, Hertford

The brief was to provide two working platforms to the five elevations facing the water to allow for window replacement. The problems to overcome were finding a method of erecting the scaffolding above the water level and designing a safe enclosed platform to protect both the contractors and the natural environment. We overcame the challenges involved in this project by designing a hanging scaffold and by using the skills of our highly trained workforce to erect on time and within budget.

 

Case Study Three - GlaxoSmithKline Stevenage

The brief was to provide a heavy duty crash deck to allow for the dismantling of a disused bridge. Challenges faced were strict works completion deadline and erection of scaffold at extremely short notice.